Bridge on #16 is complete!! The old bridge was taken down, and the creek was cleaned up and bank re-sloped. New locust poles were used as foundation and new boards were put on bridge with locust railing. Retaining walls were erected on both sides of bridge to keep bank stable and prevent future erosion. Looks very nice, will have more pictures soon!!
No comments:
Post a Comment